One of the features of our framing takeoff system is separating the total order onto several individual load sheets.These load sheets…
- Reduce exposure of the total order to weather and theft
- Address special inspection conditions, such as the open floor system inspection for crawlspace homes
- Helps with staging materials on small and sloping lots
- Allows the supplier to use smaller and more specialized trucks
- Protects the framing materials from mis-cuts by the framer – if the rafters aren’t on site, then they can’t be cut up for something else
- Reduces the amount of materials available for “borrowing” by other subs and trades on your job, and up and down the street
- Keeps materials for special applications – front porch, screened porch, third floor, outbuildings, etc. – bundled and set off separately so they don’t get mixed in with the main order
Listed here are examples of house in Weycroft – take a look.
The individual loads can be customized depending on builder preference, project size, and special conditions.
